INTRODUCTION
The Soil investigation provides
the important information for the construction notably for the foundation. The
Soil investigation will guide the methods of foundation construction (Shallow
or deep foundation, with or without piles...)
On March 24, 2014, Research
and Design Enterprise has been awarded a contract to undertake the soil
investigation for FACTORY DEVELOPMENT FOR CONFIREL PRODUCTION LINE
EXPANSION, located at Russian Confederation Boulevard, Chom Chao
Commune, Dangkor District, Phnom Penh.
The works are following:
1. Soil boring
tests for each 03 boreholes with SPT test every 1.50m intervals and 25.00
meters depths.
2. Laboratory
testing of collected samples.
The field works have been
carried out from March 24, 2014 and finished March 26, 2014. The laboratory
testing and the report have been carried out from March 25, 2014 to March 31, 2014.
This report presents the ground
conditions, soil mechanics, and results of Standard Penetration Test (SPT), and
field boring logs recording.
1.2. SCOPE OF
WORK
The scope of work for
investigation included the following:
1.2.1- STANDARD
PENETRATTON TEST (SPT)
Standard Penetration Test was
carried out 1.50m intervals inside the each boring hole. A standard
split spoons of 50.8mm diameter with a ball check value on the top and harden
steel cutter. A Standard spilt spoon was installed and drives into the soil by
a 63.5kg standard trip hammer falling freely from a fixed height of 760mm
along a guide rod. The blow counts defined for each 150mm penetration of
the seating drive. The total penetration of the spoon is 450mm and the
numbers of blow N-value for last 300mm. Penetration was recorded as the
N-value of the soil stratum encountered which indicated the relative density of
non-cohesive soil as well the consistency of the cohesive soil.
1.2.2 -
SAMPLING
- Undisturbed samples:
Undisturbed samples were taken in the natural state of the soil from firm stiff
clay and sandy clay. The undisturbed samples were taken by thin wall
tube sampler in the natural state.
- Disturbed samples: The
disturbed samples were taken at a rate of 1.5m and all strata in the
each borehole. The disturbed samples were also collected in soft to stiff clay
and sandy soil.
1.3. RELATIVE
DENSITY AND CONSISTENCY
The relationship between
Standard Penetration Test result and consistency clay, silt soil (Cohesive soil) and relative
density for sandy soil (non-cohesive soil) are shown in the table No 1 and 2,
The relation between S.P.T result and Consistency
For Clay, Silt, Clayed-Silt and Silly-Clay (Cohesion
Soils)
Table 1
S.P.T N Value
(blows/ 300mm)
|
CONSISTENCY
|
0 to 2
|
very soft
|
2to 4
|
Soft
|
4 to 8
|
Medium Stiff
|
8 to 15
|
Stiff
|
15 to 30
|
Very Stiff
|
30 over
|
Hard
|
The Relation
between S.P.T Result and Relative Density
For Sand and
Gravel (Cohesion less Soil)
S.P.T N Value (blows/ 300mm)
|
RELATIVE DENSITY
|
Less than 4
|
Very loose
|
4 to 10
|
Loose
|
10 to 30
|
Medium dense
|
30 to 50
|
Dense
|
Over 50
|
Very dense
|
Table 2
1.4. GROUND CONDITION AND SOIL PROPERTIES
For this site the ground condition from the ground surface to 25.00m
depths consisted of filling process of Mekong River or Geology was in 4th Era
(Young alluvium). The soil condition encountered on boreholes has been into
strata as follows:
BOREHOLE No 1
Stratum
No
|
Description
of soil strata
|
N-value
Blows /300mm
|
1
|
-Made ground, encountered from top to
2.50m depths
|
|
2
|
-Red stiff Lean Clay, encountered
from 2.50m to 5.80m.
|
N-1 1 :N-10
|
3
|
- Yellow grey dense Clayey SAND,
encountered from 5.80m to 8.30m.
|
N-36;N-46;N-50
|
4
|
Yellow very dense Clayey SAND,
encountered from 8.30m to 13.20m.
|
Nr=54blows
N-67;N-80;N-71
|
5
|
White grey very hard Fat CLAY with
sand, encountered from 13.20m to 18,2m,
|
N-60
|
6
|
Yellow very dense Clayey SAND,
encountered from 18.20m to 20.60m
|
N-60;N-76;N-61
|
7
|
Yellow very hard Lean CLAY,
encountered trom20.60m to 25.00m.
|
Nr=52blows
Nr=81blows
|
BOREHOLE No 2
Stratum
No
|
Description
of soil strata
|
N-value
Blows /300mm
|
1
|
Made ground,
encountered from top to 2.30m depths
|
N-19
|
2
|
Red very
stiff Sandy Lean CLAY, encountered from 2.30m to 6.70m,
|
N-19
|
3
|
Grey medium
dense Clayey SAND, encountered from 6.70m to 10.60m
|
N-27
|
4
|
Yellow grey
very dense Clayey SAND, encountered from 10.60m to 14.80m.
|
N-61
|
5
|
Yellow grey
dense Clayey SAND, encountered from 14.80m to 17.70m,
|
N-44
|
6
|
Grey very
dense Clayey SAND, encountered from 17.70m to 21.20m.
|
N-66;N-69
|
7
|
Yellow grey
very dense Clayey SAND, encountered from 21.20m to 25.00m,
|
N-105;N-121 ;N-
93;N-111
|
BOREHOLE No 3
Stratum
No
|
Description of soil strata
|
N-value
Blows /300mm
|
1
|
Made ground, encountered from top to 2.20m depths.
|
|
2
|
Yellow very stiff Sandy Lean CLAY, encountered from 2.20m to 6.20m.
|
N-24
|
3
|
-Yellow very dense Clayey SAND, encountered from 6.20m to 11.50m.
|
N-51
|
4
|
Yellow medium dense Clayey SAND, encountered from 11.50m to 15.20m
|
N-20
|
5
|
Yellow grey dense Clayey SAND, encountered from 15.20m to 18.60m.
|
N-49
|
6
|
Yellow very dense Clayey SAND, encountered from 18.60m to 22.40rn.
|
N-63
|
7
|
Yellow grey very dense Clayey SAND, encountered from 22.40m to 25.00m,
|
N-121 ;N-79;
N-83;N-76;
N-73;N-79;
N-161 ;N-76
|
1.5. GROUND WATER CONDITION
The ground water level is important for soil investigation, because the
variation of the ground water level, the characteristic of soil mechanic can be
changed. During the boring activities, water is found at a greater depth (Water
strike), but few hours after the boring completed, water table is stabilized a
higher level (Ground water level as shown in table 3).
Table No 3
Borehole
No
|
Boring started
date
|
Boring finished
date
|
Water strike
(m.)
|
Water level
(m.)
|
Date
measured
|
BH.1
|
24/03/2014
|
24/0312A14
|
>25.00
|
>25.00
|
24/0312014
|
BH.2
|
25/0312014
|
25/03/2014
|
>25.00
|
>25.00
|
25/03/2014
|
BH.3
|
26/0312014
|
26/03t2014
|
>25.00
|
>25.00
|
2610312014
|
For this area the ground water table varies according to the season:
increase in rainy season and decrease in dry season.
1.6- CONCLUSION AND RECOMMENDATION
Based on the soil data from 03 boring holes, the following recommendation
can be presented:
a- For this Project, the Pile Foundation (Bored Pile Foundation) is
necessary.
b- The allowable bearing capacity for Single Bored Pile foundation is
presented in the Table No 4.
TABLE No 4
FOR BORED PILE
Safety factor
SF=2.50
Borehole
number
|
Pile size
|
Pile depth
|
Pile length
|
Friction load
|
End pile load
|
Allowable
Pile Load
|
(No)
|
(m)
|
(m)
|
(m)
|
(kN)
|
(kN)
|
(kN)
|
BH-1
|
Ø 0.50
|
20
|
12
|
1149.42
|
589.05
|
1227.1*
|
Ø 0.60
|
20
|
12
|
1379,30
|
848.23
|
1767.15*
|
|
Ø 0.70
|
20
|
12
|
1609.18
|
1154.54
|
2405.28*
|
|
Ø 0.80
|
20
|
12
|
1839.07
|
1507.96
|
3141.59*
|
|
Ø 0.90
|
20
|
12
|
2068.95
|
1908.52
|
3976.08*
|
|
Ø 1.00
|
20
|
12
|
2298.83
|
2356.19
|
4655.03
|
|
Ø 1.20
|
20
|
12
|
2758.60
|
3365.90
|
6124.50
|
|
Ø 1.50
|
20
|
12
|
3448.25
|
4716.32
|
8164.57
|
|
BH-2
|
Ø 0.50
|
20
|
12
|
1343,91
|
471.24
|
1227.18*
|
Ø 0.60
|
20
|
12
|
1612.69
|
678.58
|
1767.15*
|
|
Ø 0.70
|
20
|
12
|
1881.47
|
923.63
|
2405.28*
|
|
Ø 0.80
|
20
|
12
|
2150.25
|
1206.37
|
3141.59*
|
|
Ø 0.90
|
20
|
12
|
2419.03
|
1526,81
|
3945.85
|
|
Ø 1.00
|
20
|
12
|
2687.82
|
1884.96
|
4572.77
|
|
Ø 1.20
|
20
|
12
|
3225.38
|
2714.34
|
5939.71
|
|
Ø 0.50
|
20
|
12
|
1281 .90
|
589,05
|
1227.18.
|
|
BH-3
|
Ø 0.60
|
20
|
12
|
1538.28
|
848.23
|
1767.15*
|
Ø 0.70
|
20
|
12
|
1794.66
|
1154.54
|
2495,28.
|
|
Ø 0.80
|
20
|
12
|
2051.04
|
1507,96
|
3141.59*
|
|
Ø 0.90
|
20
|
12
|
2307.42
|
1891 .87
|
3976.08*
|
|
Ø 1.00
|
20
|
12
|
2563.80
|
2218.95
|
4782.75
|
|
Ø 1.20
|
20
|
12
|
3076,56
|
2943.22
|
6019.78
|
|
Ø 1.50
|
20
|
12
|
3845.70
|
4204.92
|
8050.63
|
Note: -10kN=1 tone
- (*) is allowable bearing capacity for
the concrete pile,
1.7. GENERAL
The analysis and recommendation submitted in this report are based on
available information. Since significant variations in soil conditions may
occur between the boring, it is recommended that pile experienced soil engineer
to assure that the bearing capacity conform to the design and specifications.
The suggestion and recommendation herein are based on available data
obtained from limited specified soil information, the homogeneity of soil formation
assumption, and equations involved in the calculation, which are believed to be
reliable. However, such prediction or recommendations should be verified by
full-scale test of investigation during construction period to obtain more
precise reliable data. Construction method must be adopted to best suit the
analysis method assumption .We do not make any representations as to its
accuracy or completeness .Any, data or design criterion is only current
solutions which are subjected to change or revise.
This report has been prepared in order to aid in the evaluation of the
site conditions only, to assist the engineer in the design of the project,
based on our understanding of the design details, criteria & utilization of
the project as outlined herein. If our understanding of the design and
utilization is not correct, we should be promptly informed of the correct data
so that we may revise our recommendations as appropriate.